40001百老汇官网-TOP.1

Your position:Home - News - Group News

The engineering department conducted the quality assessment of dongfang mingjun phase ii
Release time:2017-01-13      Click:1035

2.png


In order to improve the engineering quality management level, strengthen the quality consciousness and pay close attention to the process management, on November 28, the engineering department, together with the supervision department and each project department, carried out the quality inspection and evaluation of the main structure of dongfang mingjun phase 2, # 20, # 21, # 22 and # 23. A special meeting was held on December 2 to make a summary. Jia shangwen, head of the engineering department, demanded that the concept of "fine management" should be firmly established. He stressed that the quality management system should be improved, the quality responsibility system should be implemented, plans and samples should be put first, technical review and acceptance inspection should be strictly carried out, and safe and civilized construction should be effectively carried out.

The purpose of this quality evaluation is to find the quality trend, analyze the quality problems, so as to carry out quality pre-control, and form the data accumulation of the construction team selection.


News
Next:The group holds meetings for cadres at or above the vice-ministerial level
Last:The 2017 five sports competition of Oriental group has come to a successful conclusion

Return

Copyright :Xuzhou Oriental Real Estate Group

Design and production:Winsharing
Baidu
sogou